Outlook Banter

Outlook Banter (http://www.outlookbanter.com/)
-   Outlook - General Queries (http://www.outlookbanter.com/outlook-general-queries/)
-   -   Resource Scheduling Error "The Operation Failed" outlook 2003. (http://www.outlookbanter.com/outlook-general-queries/9036-resource-scheduling-error-operation-failed.html)

kunalotron March 21st 06 11:05 PM

Resource Scheduling Error "The Operation Failed" outlook 2003.
 
Hi,

I am trying to schedule a meeting but all the users on the network get
the same error: The Operation Failed , when I click on the Resource
Scheduling tab under Options - Calender Options in Outlook 2003.
I recently had a server crash and my outlook was pointing to that
server. I moved the mailboxes to another server. The old server is not
even in the system anymore.
I am thinking the Resource Scheduler might still be looking for the old
server.
Any advice on how to change the path or any other suggestion to fix the
problem.

Thanks
Kunal



All times are GMT +1. The time now is 05:57 AM.

Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 2.4.0
Copyright ©2004-2006 OutlookBanter.com